TAIL SECTION: Horizontal Stabilizer work performed by previous Builder

Updated: Aug 27, 2019

The Horizontal Stabilizer was completed by the former builder sometime before 2003. Internal parts were primed and it has been dry fit to the empennage. The elevator and trim tab have been attached.

It is currently hanging on the workshop wall awaiting dry assembly, finish, and final assembly.