top of page

FUSELAGE: Bulkheads installation by former Builder

  • Writer: Paul Catterson
    Paul Catterson
  • Apr 7, 2012
  • 1 min read

Updated: Aug 20, 2019

All 4 fuselage bulkheads were completed by the former builder.

NOTE: The only item I still need to verify is whether the forward side of the baggage bulkhead requires fiberglass tape over the micro joint. Original builder said either "plans didn't mention it" or "plans said it was not required". I have seen other Glastar builder sites that showed tape there. I may do this anyway for safe measure.

UPDATE 05/10/12: I have confirmed that this is the proper method for installing the rear baggage bulkhead.


 
 
 

Comments


©2019 by Glastar No.5788. Proudly created with Wix.com

bottom of page